Temecula prices
Pricing a full re-roof in Temecula
A full replacement is priced by the square — a hundred square feet of roof — and then adjusted for everything that makes your roof different from an average one.
Or call (951) 466-2546Your request is in.
We are matching it now against roofing contractors working in Temecula and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Temecula is built. No contractor is bound by them, and nobody can price a roof they have not stood on.
| Covering | Per square | Typical whole roof | Expected life |
|---|---|---|---|
| Architectural asphalt shingleThe default choice on most American homes, and usually the right one. | $675 – $975 | $13,500 – $27,500 | 25 to 30 years |
| 3-tab asphalt shingleThe cheapest thing that still counts as a roof. Fewer and fewer crews will install it. | $550 – $700 | $11,000 – $19,500 | 15 to 20 years |
| Impact-rated asphalt shingleClass 4 rated. Often earns an insurance discount where hail is a factor. | $875 – $1,300 | $17,500 – $36,500 | 25 to 35 years |
| Concrete tileThe tile lasts far longer than the underlayment beneath it, which is the catch. | $1,300 – $2,100 | $26,000 – $59,000 | 40 to 60 years |
| Standing-seam metalThe long game. Costs double up front and outlives two shingle roofs. | $1,600 – $2,700 | $32,000 – $75,500 | 40 to 70 years |
What moves the price
- Access — a truck that cannot get near the house adds hours to every load
- Whether the valleys, drip edge and step flashing are being replaced or reused
- Ventilation work, if the old roof was cooking itself from underneath
- How many old layers have to come off before the new one goes on
- How much decking turns out to be soft once the covering is stripped
Locally
Dry offshore wind lifts material that damp coastal air had been holding down. Most wind losses here happen on a handful of nights a year.
Treat this as the shape of the market, not a price. The only real number comes from somebody who has been on your roof.
These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Temecula is built. No contractor is bound by them.
Questions about price
How many contractors will contact me?
Up to three. That is a hard cap, not a guideline. Three is enough to compare and few enough that your phone stays usable.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
Are gutters included in a re-roof?
Usually not, unless the quote says so. If they are near the end of their life, replacing them during the re-roof is meaningfully cheaper than doing it later, because the crew and the staging are already there.
Get it priced
Three questions, about a minute, and up to three Temecula contractors come back to you.